Thanks again Gerry for a great set of photos.
Although bits of this aspect has been covered a number of times over the past weeks, Wednesday's offering begins with a full sequence of window reinstatement in TSO 4867.
Initial cleaning followed by a coat of Red Oxide.
The wood surrounds are fitted using the self tapping screws.
The windows are inserted using double-sided adhesive tape.
The wood at the base of the window is drilled for the drainage pipes.
 |
The inner surround is fitted holding the window frame in place. |
The final outer surround is fitted to complete the job.
The self tapping screws.
********
Now on to the rest of the day.
Nick works with Neil and Mike to replace a corroded floor support in 4867.
Glass extraction from one of 4867's toilet windows ready for the removal of the frame.
Laura, Eve and Ceri working on more seats for 4867.

Judging by the dark grey on the rag on the paint table, Ainsley has just wiped his brush of excess solvent before undercoating the face of the south corridor connection on SK 25451.
Ken removes the corridor connection from the south end of TSO 4406 to allow Alan to continue his sheet metal repairs on Thursday.
Trevor cleaned up the toilet compartment window surround ready for extracting on the Malvern side of 4406.
Ken threading a steam heating pipe (I'm presuming this is for the GW Inspection Saloon)
***************
Thursday
The temporary electrics testbed area set up in the Paintshop by the Richards.
Over to Rake 3 where Alan is making some more repairs, this time to a door pull in CK 16195.
Now where did this come from? No drips round the ceiling vent and the window sliders look tightly shut. That rain we had was very heavy so it may have come through the latter. Thankfully it was all on the table.
Some ongoing repairs in FK 13326, externally the best looking coach in the Rake.
As said several times recently, the general exterior look of the coaches used for Rakes 3 and 4 might be not so good, but for most of them the interiors are generally still very good. Paul on his own again, but Jenny is back on Saturday.
Rose working on C & W's finances. She is amazing! As if she doesn't do enough, she has now taken over the Deputy Finance Officer job from Phil, who has now retired from the role.
The ongoing work being done at the south end of TSO 4406. It looks terrible, but Alan has been making great progress.
"Hang on", Alan said, "I'm just about to use the large grinder".
Gerry was cleaning up the empty toilet window space on the Malvern side.
In the Barn entrance Tony was cleaning up one of the two frames removed from the toilet compartments, removing the worst of the old paint and sealant.
A nice easy way to carry it into the Workshop for the next job.
Now for some deep cleaning.
Finally another collection of photos of the 25451 show. Apologies for so much on this, but it's where I work and am thus able to obtain the most photos while doing as usual all the necessary logistics and being around to allocate the various jobs and offer advice when needed.
The top coating begins with Stu adding the first of the Crimson to the Cotswold side. He did the entire length of the coach along the gutter panel.
Graham followed with the GW Cream initially doing the windows.
Tony was continuing the flatting on the Malvern side lower section. Are we taking too much off in our bid to gain a perfect final coat? Graham recommends two undercoats anyway so the colour will be restored.
Martin tidied up the missing bit at the north end. In the distance Richard and Tony continued the flatting.
Stu is a very good painter, but happily watches Graham top coating so as to pick up any tips.
Tony, another of our top painters, now adds the second coat of undercoat to the parts he had been sanding.
Stu now adds the first coat of Crimson to the Cotswold side south end and door.
Richard continues top coating the Malvern side gutter panel.
Graham well on the way to completing the Cotswold side cream section.
Sorry, no train photos today. I think I only saw two passes of Train 1 and completely missed the Bubblecar passing by.
***************
COMING SOON
"WEEDLINK AT GWSR"
A detailed wrap-up of the creation of the Weed Spraying wagon
by
Bob Slater