Monday 22nd - A Chilly Start
It was a bit nippy to start with, 4°C, so a bit of a shock after the long hot summer. But the sun came out and it was a nice pleasant temperature.
This week we had rake 1 in platform 2 and rake 2 in platform 1. Here are David, Peter, Tim and Chris almost finished on rake 1. Regular Paul was missing - 1 of 3 on the sick list.
In order to get some photos I have found it is best to walk through the trains first, then I can fill in where needed.
Kath was first, in "Mary".
Then Long Tall Steve.
A smiling Lynn, even on toilet duties!
Then to Val (Lynn trying to hide!)
Val's husband, Roger C, is recovering from a major operation, so he was just a visitor today while Val worked hard.
Then on to Greg
I then took a GTech and did the floors in 4 of the rake 1 carriages. This rake needed a good tidy, rake 2 was very clear.
Comments
Post a Comment