Busy or what! With so much to do, occasionally some overtime is needed, especially when it enables exclusive access to areas that are otherwise very busy, and RBr 1675 is certainly that with some jobs impossible, Painting falls very much into this category.
However, firstly to answer more questions from recent comments.
Hi Malcolm,
I did know what you meant. I don't think Derrick ever forced the vertical orientation of the screw heads because that is why Paul was forever tightening them up. It became a joke when Derrick put them back vertically, only for Paul to tighten them yet again. I can't remember who "won" in the end, but it did give us all a laugh.
I forgot to check whether we do line the heads up, but I think it unlikely.
Crikey, 10 minutes to hang a door and get it working! If only we could do that.
**********
First in today, so kettle on, water boiler on, make a cuppa, and top up the tea caddy.
Walking into Upholstery to see these lovely displays of seat sides covered with Snapdragon moquette. I'm not sure whether these were laid out for me to photograph, or for another of the formal tours that was taking place on Wednesday afternoon.
2807 hauls the first train of the day.
We need to get some top coat on the new planks for the seat at Hayles Halt, so Jeff takes this on and does a good job.
In the Barn the work to make the lovely BCK 21272 operational continues. Richard I continues the upgrades to the electrical system.
The clean up of the luggage compartment and guards corridor continues, with Bob K. adding sealant to the ceiling beading ............................
................... while Bob S. vacs the grill, which is covered in dust. Various ledges will also need this, followed by a wipe down with thinners to remove the last bits of grime. Overall the recent undercoating by Dave H. has really improved the whole appearance of the area.
On the way back to the Paintshop, a quick check to see Derek's repair work from inside Monster Van "600".
Phil works on a connection door mechanism for probably FK 13326.
A problem with this quarter door meant that some more work is needed. Gerry cleans up around the three hinges.
Earlier in the day both Bobs undercoated a lot of the Malvern side of 1675.
Some minor alterations had been done on the front of the calor gas boxes. Bob tidies up the internal paintwork.
Also on the Cotswold side, Gerry removes the temporary fittings from this kitchen window and replaces them with full rubber seals.
In the small electrical room the 240 volt main control and distribution panel, that Richard II was building a few weeks ago, is now in its final location. Richard is wiring up the various circuits. This room still has to be painted throughout.
Jeff has a more straightforward job, continuing the preparation and undercoating in the counter and closet area.
Ian and Roger installed more of the covers for the saloon radiatiors.
Saturday afternoon the plan is to clean up inside in preparation for the laying of the marmoleum. on Tuesday.
Friday
There were four of us in as well as Stu, our Workshop Manager who attends Wednesday - Saturday.
It was a lovely warm day, ideal for the Gold Fire & Drive event, the members of which had a 20 minute tour of C&W. 2807 was the loco used - an excellent choice.
My reason for attending was as described at the beginning, a chance to complete the filling and sanding, and begin undercoating in 1675's corridor.
Tomorrow, work will be going on here with more ceiling panels installed and threshold strips being put down.
The north end sliding door, also cleaned up and ready for painting, though it will likely spend its time fully open and thus out of sight.
Alex and Maurice discuss the latest load of planking for the MICA van.
Fully primed and ready for undercoating.
The initial set of planks now top coated and ready for fitting.
Maurice's final job of the day, undercoating the south end headstock.
We enjoyed today. Another overtime one will be planned soon.