Wednesday 24th - Not floored by the flawed floor
Thanks to Richard for the report today. He and Paul were working on the Toad, so we'll start there, where more timber was being stripped off:
A panoramic view, the first floor planks coming up for investigation, and revealing access for the drawbar. The proposed plan is we strip back the floor planks and replace with new at the veranda end where rot has set in, but probably leave most of the ones inside as they are still sound.
Wednesday is always a good day to catch the door team at work on their benches, Trevor and Rod are both onto doors for the CK in the workshop now:
Geoff wields the broom while Trevor makes use of the band saw:
Ainsley was fitting the capping stirp to the last door on 34929:
I'm afraid I'm not quite sure what Phil and Rex were doing, whatever it was was in the vice for both of them!
Note the woolly hats, our heating is overdue a service :(
I'm not quite sure what John was doing on the drill either, but on the right Bryan was painting a bracket to hold the wand for the pressure washer, as that is where it lives, little things to make everything that bit more convenient:
Up in upholstery the march of the bubble car seats continues with John and Steven measuring out the next section of material:
Rex is making a new tool for PWay. Phil is cleaning up another light fitting.
ReplyDelete