Monday 16th - Top Job for Top Man!

 


John is our Team Leader so he gets the Top Job!

Just 8 for cleaning today but still a lot done. The sets had been pulled back towards the Winchcombe end of the platform so we were able to wash the outsides of carriage A - the one that is normally off the platform under the road bridge. In fact all 7 Malvern sides of rake 1 were washed but only A - F of rake 2 - carriage G was off the platform at the south end!

The insides of both sets were done with rake 2 having the Ghostbuster treatment. It needs a vac to get all the dust and debris out of the door runners. And yes, a surprising amount of coal dust is there.

We can tell things are getting back to normal - a steady stream of punters hoping for a train ride are turning up again on a Monday!

Comments

Post a Comment