Monday 3rd - We're Back As Well!

 So looking forward to seeing everyone again, then over the weekend the apologies came in. Slipped in the shower and hurt ribs; emergency visit to vets for dog (2 separate volunteers); the sun is shining so the roofer is coming to do repairs. You couldn't make it up!

So the first photo is John M getting sorted to start on toilets.


Just the one main rake (an 8 coach set but the one at the north end is locked out of use to passengers - will be used for the Race Trains next week) and the hired in bubblecar. So Roger C and myself went down to that leaving the 9 others on the main rake. Roger C cleaning windows.



Here is Paul washing the end carriage, and Jane, David and Tim enjoying the sunshine!


And Val, Roger C and Lynne walking back down the platform.


Greg and Steve made up the rest of the team. 

After the tea break Greg, Lynne, Roger C and self went through with Gtechs and Ghostbuster to finish off.

To finish some pictures of the bubblecar, here courtesy of the Chinor and Princes Risborough railway.






Last is a picture from my ride on Saturday. The layout is very different from our own bubblecar - and the ride is much better!!

No cleaning for us next week as the contract cleaners are in for the Race Trains, we are back on 17th March.


Saturday 1st - We're back!

 


It was great to have trains back running again, and a bright fine day it was too, albeit with a frost to start off with. After the short but busy winter maintenance period, we could get back to doing what we do best - waving at trains.


"Seeing as the workshops are quite empty at the moment..." I asked, "Could we come inside?" Robert captured the shunting team kindly picking up the Open C to bring into the works.


We tried the workshop, where it was heated, but it didn't quite fit.


Oh well, the barn will do, dry and level ground to work off, luxury!


One bit of metalwork we hadn't got round to reinstating were the diagonal braces. That was John's mission for today. As they won't actually be seen, we're not too worried about replicating the original rivetted look, bolts and welding this time.


Robert and Chris started looking at the planks for the floor. It was all going to be so easy until I showed them the diagonals John was putting on. "That's going to make it a bit more complicated!" The necessary rebates were carefully marked out


And Robert captured Chris chiselling away.


Paul captured me with the angle grinder, doing a job I'd wanted to do for ages tidying up some of the very messy BR-era gas weld repairs.


These bits and various other patches were then primed and undercoated by Paul and Maurice.


The less good news was on the buffers. We knew they were seized and needed to be looked at, so we had the first one off today. Our hope was that once taken apart we could sort out whatever was wrong. We were soon disabused of that ambition when the spring came out in 4 parts and we found the buffer head split in the casting housing and still seized solid. That one is most definitely beyond repair, and we're now not feeling very optimistic about the other 3....


Oh well, lets go and watch another train. This time the guest bubblecar on loan from Chinnor until April. We don't have any other DMU timetables until September, by which time hopefully our own bubblecar will be finished.


In fact the weather was so nice we had lunch outside on the platform, soaking up the atmosphere as Foremarke came past again.


The other major task today was the beginning of work on TSO 4867. It came in on the jack road, initially to have the interior stripped for removal of 'heritage' materials.


James needed the loo twice...


It didn't take long before everything was stacked in the barn, ready for contractors in a week or two to remove the currently undisturbed material.


Back to 4798, James began the rebuild of the metal framing after his vandalism session last week.


While Ken was working on the South end, I imagine in connection with the comms cord apparatus.


James also kindly saved me a job adding the roundel on the side... :-)


Onto the RBr then, Dave finished off vacuuming the roof.


And Bob cracked on with the cream on the Cotswold side. I was quite glad to have avoided that large cream panel with no windows!


I finished the day doing the first coat of gloss brown on the Malvern side instead.


Before writing the whiteboard for the Open C for the week. Hopefully we should see this come together quite nicely soon.

Thursday 27th - A major milestone achieved

After yesterday's shunt to complete the final formation of Rake 2, our shutdown period was officially over. Not so many attending today, but a major milestone was achieved by the end of the day.

Over the past couple of days the police and army have been conducting an excercise using Rake 3. Alan, Geoff and Paul take a few moments to watch the activity.

With Stu driving the 03, the eight coach Rake 1 passes by on its return to Toddington. Rake 2 followed afterwards.

Rake 3 will be set up in its final configuration in preparation for Race week, after which RMB 1876 will be made ready to come into the Works for maintenance and repainting. 1876 was on our side of the yard and so not involved with the police/army excercise. Paul walked through the coach looking at various aspects requiring immediate repair by the Indoor Gang - Alan, Geoff and Roger.

It was just Bryan working in SO 4798 today, preparing more internal window frame. The milling machine is being used to produce counter bores in which to insert the special nuts. When the screws are in turn inserted the piece of frame is tightened against the window. These all get retightened when fully in place which stops leaks.

I didn't catch Derek working on the Monster van. This was the only other activity not involving RBr 1675 which had quite a concentration today.

With the underframe dust removal completed, it was now the turn of the roof. We can reach almost all the roof from our large scaffold tower, especially when extra metal piping can be added to the existing lengths when vacuuming. Phil begins the job at the north end.


Bob Mack's excellent painting is once more revealed. Far better to get this done inside than leave it for the wind and rain to remove.


Alan, Geoff and Roger did some final work on the corridor connection doors. 1675 will spend its time in the middle of the train, so both doors will remain permanently open. Despite this both must be able to be closed and locked correctly. I later returned to painting the door edge.


The south end door originally did not close properly, but previous adjustments made by Robert and Chris ensured that it is now fully functional. Paint repairs are in progress, and now Roger completes the job making some final adjustments to the closing and then refits the door catch to enable it to be locked open.


The team also completed the fitting of some missing sections of skirting. 


Meanwhile main painting continues with Martin working on the Malvern side from the south end, adding the first coat of GW Cream. Some of the windows on this side have already been given an initial top coat, presumably done as a fill-in job when nothing else was available.




Bob started from the north end. However, with a tin being emptied following removal of a skin, it was definitely desirable to dig out the supply of old tights!


Bob started at the north end and the first coat of cream was completed.


Today the two Richards and a visiting contractor conducted the commissioning of the batteries and battery inverter in 1675. I am very pleased to report that the testing was successful. All the electrics are working as designed and as such a major milestone has been achieved.

Tuesday 25th - A very special day

Today was a very special one with the Memorial Service for Bob Mackintosh, always known as Bob Mack, and one of the original volunteers on the Railway and in his latter years regularly helping in C&W.

The service booklet was beautifully produced and completely based on the Railway.


Toddington Church was packed to the point where quite a few of us were sat in the chancel. Sadly because of the acoustics and echoing we could hear almost none of the readings, but it was still good to be there.


Roger took the above with some great photos displayed.
 
The Railway Recollections read by Richard Johnson, Head of C & W for 18 years and then, until recently, our PLC Chairman, vividly detailed what a huge part Bob played in the early days of the Railway, taking on so much responsibility in its organisation and running. Richard had in effect known Bob for 44 years, almost literally from the beginning, so his anecdotes were many and varied, many of them humerous. For a lot of us joining in the 2000s, Bob was still heavily involved as a regular Duty Officer, Guard, Signalman, the PLC Finance Manager, lineside clearing, and with C&W one of our regular roofers. Both RBr 1675 in the Paintshop and SO 4798 in the Workshop have roofs that are already fully painted thanks to Bob, and in fact the first roof we will have to tackle without his excellent work will be RMB 1876 when that eventually comes into the Works.
 
The reception was held in the Cotswold Halt cafe at Toddington Station, with the room almost packed out with so many attending. An excellent buffet had been laid out with hot and cold drinks available.
 
Overall it was a lovely memorial for Bob and our thoughts go out to Gillian, Alistair and Jane.


**************

Many thanks for all the recent comments and kind thoughts that have been passed on in the blog with respect to our efforts.

In answer to the Cornishman magazine anomaly recently highlighted:

I noticed in the latest edition of 'The Cornishman' that it was reported the tables and chairs had been installed in RBr 1675. I don't know if it's my increasing age, but I can't recall seeing any photos of this in your usually comprehensive C&W Blogs. Did I blink and miss them??
A Pettifer

When writing the Carriage & Wagon report for The Cornishman it is not uncommon to have to anticipate events or as we like to say "write for the future". Our report in the Spring edition of the magazine was written in mid-December, so with the saloon in 1675 basically completed, it was not unrealistic to assume that by mid-February the tables would have been installed, with the chairs rapidly following. However this was not to be and the saloon currently remains empty. The likely cause for the delay will be the many repairs needing to be done to our coaches during the shutdown period. With shutdown almost ended and services restarting this coming weekend, we will be able to fully return to the refurbishment programme.

***************

Now on Tuesday's efforts.  Grateful thanks to Paul E. for the extra photos taken while I was attending Bob Mack's memorial service and reception.


Richard completed the painting and varnishing of the repairs previously made in the corridor and south vestibule in FK 13329 by Simon and Alan.


Part of one of the new veneer panels and surround, stained and now given a coat of varnish.

The repair to the water-damaged panel in the south vestibule. 13329 has been added to Rake 1 as the 8th coach for the four days of the Cheltenham Race meeting.

[Photo : Paul E.]   In the Workshop Bryan drills holes in the final compartment windowframe on the Malvern side of SO 4798. Ainsley also worked on the coach, doing some more general sanding of the Cotswold side.


While Richard pours back some unused paint, Keith primes a number of large bolts which are either for the MICA van or Open C wagon.
 

 [Photo : Paul E.]   The bolts dried quickly enough to be further painted.
 
 

[Photo : Paul E.]   Painting the underframe of the MICA van was done by both Maurice and Paul..

 

[Photo : Paul E.]


[Photo : Paul E.]


[Photo : Paul E.]   Just outside the Paintshop on the Works siding, Maurice is working on one of the axleboxes on the Open C wagon.

When RBr 1675 arrived in the Paintshop it was covered in dust, which meant a major clean of the body sides had to be done before we could completed the remaining bits of undercoating. The underframe, headstocks and corridor connections are as bad and as such we needed to get these similarly vac'd and wiped over, especially with the top coating which has now been started. Ian took on the job and literally circumnavigated the coach, leaving just the underframe elements that were dirty - decisons will be made as to how much of these are to be cleaned and even painted.

[Photo : Paul E.]  The final major dedusting job will be the roof.

The bogies must have been gritblasted for them to have been painted up this much. There will be work to do on them when the coach goes into the Barn and on to the jacks.


Ainsley also went around 1675 adding little tape bonnets to the tops of the door hinges to prevent them being painted. We, the painters, haven't done enough of this in the past, hence the justified grumbles by both the Door and Friday Maintenance teams when it comes to greasing the hinges..